How do I perform the pre-test inspection for TOS5300 series?

Follow these steps to check the test leads and TOS5300 functions:

  1. Short-circuit the LOW (black) and HIGH VOLTAGE (red) test leads.
  2. Connect the black lead to the LOW VOLTAGE terminal and the red lead to the HIGH VOLTAGE terminal.
  3. Set the test conditions:
    • For a withstanding voltage test: set the upper limit (UPPER).
    • For an insulation resistance test: set the lower limit (LOWER).
  4. Press START to start the test.
  5. Review the results:
    • For a withstanding voltage test: U-FAIL indicates normal operation
    • For an insulation resistance test: L-FAIL indicates normal operation

If you get unexpected results, there may be a disconnected test lead or a malfunction of your TOS5300 unit.
For more details, read the user’s manual – chapter of Maintenance – Pre-Test Inspection.